Eagle Movement (Movement of the Eagle) is publishing a selected collection of official documents connected with the development and later institutional treatment of the Europort Shëngjin project.
Official Documents Europort Shëngjin
The purpose of this publication is to make the documentary material available for direct public examination.
The documents are presented chronologically. Readers are invited to open the original PDF files and examine their contents themselves.
This publication does not ask the public to treat allegations or interpretations as established facts. It establishes a documentary record and identifies questions arising from that record.
2008
Declaration of 15 May 2008 – P17 / EM-23
The declaration records the commissioning and delivery of conceptual projects and models for Europort Shëngjin and Euro Port Vlora. It expressly states that the projects and corresponding models belong to Lirim Muharemi. This is the wording of the parties’ declaration, relevant to the project’s contractual history.
PDF – 15.05.2008OPEN PDF
Notarial contract of 11 November 2008 – P18 / EM-24
The contract identifies Lirim Muharemi as investor and B.E.–Alba–Konstruksion as designer, represented by engineer Xhevair Ngjeqari. It concerns preparation of the new Shëngjin Europort concession dossier, with a stated design fee of EUR 250,000 and a 75-day design period. It is a contract for preparing documentation, not itself an award of a state concession.
The cover’s early reference figure is 40 million tonnes per year; this must be distinguished from the later documents recording 60 million tonnes per year. The public copies have personal data and handwritten signatures redacted.
OPEN NOTARIAL CONTRACT – 11 NOVEMBER 2008OPEN PDF
2013
24 FEBRUARY 2013 – PREÇ ZOGAJ (P20 / P26)
The published convention speech expressly discusses Europort Shëngjin , a completed study and ships up to 500,000 tonnes. The six-month reference concerns starting tourist ports, not completing Europort. P20 is a supplied English translation; P26 is a later source summary.
READ THE ORIGINAL ZOGAJ PUBLICATION
OPEN P20 / P26 – PDF PAGES 2–3OPEN PDF
1 MAY 2013 – XHEVAIR NGJEQARI (P27)
The signed article identifies Lirim Muharremi as the project’s administrator and owner. This is the author’s contemporary statement; legal title requires assessment of the underlying documents. P27 is a later source summary.
READ THE ORIGINAL NGJEQARI ARTICLE
OPEN P27 – SOURCE SUMMARYOPEN PDF
MINISTRY OF TRANSPORT AND INFRASTRUCTURE – 18 OCTOBER 2013
Official Letter by Minister Edmond Haxhinasto
On 18 October 2013, Albania’s Minister of Transport and Infrastructure, Edmond Haxhinasto, issued an official letter concerning development of the Port of Shëngjin .
The document expressly identifies LM&CO, its administrator Lirim Muharemi, and the project:
Europort Shëngjin – “Eagle of the Adriatic”
The letter authorizes LM&CO and Lirim Muharemi to contact and facilitate the attraction of investors interested in developing the project.
The document carries the Ministry’s official stamp and the Minister’s signature. The file also contains an English translation and notarial confirmation.
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDFMINISTRY OF TRANSPORT AND INFRASTRUCTURE – 24 DECEMBER 2013
Official Letter for Presentation to the European Investment Bank
A second official document was issued by Minister Edmond Haxhinasto on 24 December 2013 for presentation to the European Investment Bank in Luxembourg.
It is addressed to Lirim Muharemi & Co.
The Ministry states that it welcomes initiatives for the development of Shëngjin Europort and describes the project as one of the most important infrastructure investments in Albania, whose development was being treated with the highest priority by the public sector.
The Ministry further declares its willingness to support the rapid and professional development of the project.
The file contains the Albanian original, English translation and notarial confirmation.
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDFSOCIALIST PARTY PROGRAMME – 2013 (P21)
The programme “Për një Rilindje Shqiptare” addresses Shëngjin ’s depth as a strategic asset, port development, logistics and rail links. The published extract includes printed pages 35–37, on PDF pages 3–5. It documents a political programme; it is not a concession award or a determination of project ownership.
OPEN SOCIALIST PARTY PROGRAMME – P21OPEN PDF
2014
ARBEN AHMETAJ – MINISTERIAL PUBLICATION, 16 JANUARY 2014 (P25)
Ministry of Economic Development, Trade and Entrepreneurship
The archived ministerial website publication reports the eighth session of the Albania–China Joint Commission for Economic and Trade Cooperation and reproduces Minister Arben Ahmetaj’s full speech.
It expressly identifies construction of the new Port of Shëngjin as a priority project, with regional importance for Albania, Kosovo, Serbia and Bulgaria. The speech also refers to the Albanian and Chinese prime ministers’ meeting in Bucharest.
The preserved publication is from the economic development ministry’s website, ekonomia.gov.al, rather than a finance-ministry publication. It is reproduced on PDF pages 20–21; the Shëngjin passage is on page 21. This records the ministerial presentation of the project in the context of Albania–China cooperation; it does not itself establish a transfer of project rights or completed financing.
OPEN ARBEN AHMETAJ PUBLICATION – 16 JANUARY 2014OPEN PDF
EUROPEAN INVESTMENT BANK – 28 FEBRUARY 2014
Official EIB Letter Addressed to Lirim Muharemi & Co.
On 28 February 2014, the European Investment Bank (EIB) sent an official letter from Luxembourg to LIRIM MUHAREMI & CO, for the attention of Mr Lirim Muharemi.
The letter carries the reference OpsA/MA-3/MR/cr.
It concerns possible EIB financial support for construction of the Europort Shëngjin project in Albania and expressly acknowledges the Albanian Minister of Transport and Infrastructure’s letter dated 24 December 2013.
The EIB explains that any loan approval would require detailed economic, technical, environmental, social and financial due diligence. It states that the project was not yet at a maturity level that allowed a proper technical and economic analysis.
For a preliminary assessment of the project’s eligibility and viability, the EIB requested extensive information concerning investors, financial structure, land, traffic forecasts, economic viability, environmental procedures, road and rail connections, port depth, bathymetry, quay and breakwater design, project costs and procurement.
The document shows that Lirim Muharemi & Co. and Europort Shëngjin were directly engaged with the EIB in 2014. It should not be described as an approval of financing or a loan.
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDFTRANSPORT INFRASTRUCTURE PRIORITY PROJECTS – 2014
Republic of Albania – Ministry of Transport and Infrastructure
The next document marks an important stage in the chronology.
The official Transport Infrastructure Priority Projects 2014 document states that the projects were prepared in connection with the Government Programme for 2013–2017.
Within the maritime transport priorities, the document identifies construction of the:
NEW PORT OF Shëngjin
as a priority.
The project description places the proposed new port in northern Albania and describes its regional importance in relation to Kosovo, Macedonia, Serbia and other countries in the region.
This document is particularly significant when read alongside the two Ministry letters from 2013, which had already explicitly identified LM&CO, Lirim Muharemi and Europort Shëngjin , and the EIB letter of 28 February 2014 addressed directly to Lirim Muharemi & Co.
It therefore raises an important documentary question:
What was the relationship between the government priority project and the Europort Shëngjin project documented before it?
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDF2018
VKM NO. 480 – 31 JULY 2018
Official Gazette of the Republic of Albania – No. 119
The linked document is the full Official Gazette of the Republic of Albania, 2018 – No. 119, containing Decision No. 480 of 31 July 2018.
The document approves Albania’s National Energy Strategy for 2018–2030.
The relevant passage concerning the construction of an intermodal port in Shëngjin appears on PDF page 45, corresponding to official page 8376.
This document should be read in chronological context with the surviving Europort documentation, the Ministry’s 2013 correspondence and the Government’s 2014 infrastructure priorities.
Eagle Movement presents the document as documentary evidence of the later governmental planning record.
It does not, by itself, establish the origin, authorship or ownership of any earlier project.
That is precisely why the chronological record matters.
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDF2019
ADF / EBRD DOCUMENTATION – 2019
Albanian Development Fund / European Bank for Reconstruction and Development
This document comes from 2019.
It is a Biodiversity Impact Assessment concerning the proposed Shëngjin –Velipojë road scheme.
The document identifies the European Bank for Reconstruction and Development (EBRD) and the Albanian Development Fund (ADF) in connection with the assessment.
The Executive Summary states that the biodiversity impact assessment was carried out in 2019 in connection with the proposed infrastructure scheme.
Section 5.5 expressly names Shëngjin Europort and describes an estimated capacity of 60 million tonnes per year, together with two proposed tunnels linking the port beyond the Renci mountain range. The passage appears on page 9 of the published PDF extract, with its continuation on page 10. These are recorded project characteristics; the assessment does not itself determine authorship or ownership.
This document forms part of the later institutional documentation concerning infrastructure development in the wider Shëngjin area.
VIEW ORIGINAL DOCUMENT (PDF)OPEN PDF2024
AIDA – ALBANIA CALLS 2024
Albanian Investment Development Agency – Transport & Logistics
The official AIDA investment publication Albania Calls 2024, in the “Sea Transport” section under “Port of Shëngjin ”, states:
- Expected trade connections with Kosovo, Serbia, North Macedonia and beyond.
- Total capacity: 60 million tonnes per year.
- Overall construction cost: EUR 1.2 billion.
The entry is on PDF page 46 (printed page 45). It records the port capacity and construction cost in AIDA’s 2024 investment promotion material. The entry itself does not identify the project’s author or determine ownership.
OPEN AIDA 2024 – ORIGINAL PDF, PAGE 46OPEN PDF
2025
UN TOURISM – INVESTING IN ALBANIA 2025
Tourism Doing Business – Investing in Albania, second revised edition, 2025. PDF page 71 (printed page 45) records 60 million tonnes per year for Shëngjin Port. The year is confirmed on PDF page 3. This documents the published figure; it does not establish actual throughput or project ownership.
OPEN UN TOURISM 2025 – PDF PAGE 71OPEN PDF
UNDATED DOCUMENTS AND CONTEXTUAL MATERIAL
MINISTRY OF FOREIGN AFFAIRS – NEW PORT OF Shëngjin I (P22)
Three photographed pages bear the heading “MINISTRIA E PUNËVE TË JASHTME” and the project title “NEW Port of Shëngjin I”. The detailed description expressly uses “Eagle of the Adriatic” and “ Europort Shëngjin ”; the comparison table lists 60,000,000 tonnes per year and 2,600,000 containers per year for Shëngjin . The project summary states a cost of EUR 1.1 billion.
The photographs appear on PDF pages 2–4 of the published attachments, with the capacity table on page 4. The date of preparation, protocol number and archival provenance remain to be confirmed. The heading and wording are visible in the photographs; this does not itself establish project ownership.
OPEN P22 – THREE PHOTOGRAPHED PAGES, PDF 2–4OPEN PDF
Additional source material
Original reproductions, translations and later summaries are identified in the source files. Event dates, publication dates and print dates must be distinguished.
OPEN PRESS ARCHIVEOPEN PDF
OPEN INSTITUTIONAL ARCHIVEOPEN PDF
THE QUESTION THE DOCUMENTS RAISE
Eagle Movement does not ask readers to substitute chronology for proof.
Instead, these documents raise questions that deserve documentary answers:
Who designed the later government project?
When was it designed?
Who commissioned and financed its preparation?
Where are the original feasibility study and detailed design?
Who are their authors?
And most importantly:
What relationship, if any, exists between the later governmental projects and the documented Europort Shëngjin — “Eagle of the Adriatic” project that had already been presented to the Albanian authorities?
The documents should speak before conclusions are drawn.
A DOCUMENTARY RECORD – NOT A VERDICT
Eagle Movement publishes these materials so that the public can examine the original record directly.
Documents establish what they contain.
Documents can also raise legitimate questions.
But a chronology alone does not establish unlawful conduct, project ownership or legal liability.
Where something is documented, we will identify it as documented.
Where something remains disputed, we will identify it as disputed.
Where a conclusion has not been established by competent authorities or courts, we will not present it as a judicially established fact.